Vehicle Description
Recent work done:
- REPLACED FRONT BRAKE DRUMS, SHOES, WHEEL CYLINDER, BRAKE HOSES, INNER AND OUTTER WHEEL BEARINGS AND SEALS, GREASE ALL ZERK FITTINGS. DISASSEMBLE AND CLEAN BRAKE MASTER.
- REPLACED REAR BRAKE SHOES, WHEEL CYLINDERS, BRAKE HOSE, REMOVE AXELS AND REPLACE BEARINGS, REFILL REAR DIFFERENTAL
- REPLACE VALVE COVER GASKETS AND TUNE UP, REMOVE CARBURETOR TOP AND CLEAN JETS AND FLOAT BOWLS
- REMOVED AND ROD RADIATOR
- REMOVED AND REBUILT POWER STEERING BOX, REPLACE POWER STERRING PUMP AND HOSES
- OIL AND FILTER CHANGE WITH LUCAS
- A/C SYSTEM REBUILT
- DRIVE BELTS REPLACED